The Miami-Dade roof permit application identifies the job and shows the roof in a drawing. It explains how the roof will be built. The supporting documents depend on the roof system. When you initial each of the 8 items on the county's owner's notification form, you're confirming that your contractor explained that item to you. This guide covers the county's uniform application under the 2023 Florida Building Code and its separate notice for reroofing. At Apex Roofing Solutions Corp., we offer a free roof inspection. We put the price and every fee in writing. After the deposit at signing, your replacement payments are tied to permit approval and two passed inspections.
Key takeaways
- In Miami-Dade County's uniform application, Section A identifies the job and Section B shows the roof layout.
- Section C covers low-slope roofs. Section D covers steep-slope roofs. If you're getting tile, Section E also checks how the tiles will be held down.
- The county's application lists 7 categories of attachments. Check the instruction table to see which ones go with your roof system.
- There are 8 items on the owner's notification. When you initial a line, you're recording that the contractor explained the item beside it.
- For an Apex home roof replacement, you pay $500 at signing. Of the remaining balance, you pay 35% at permit approval. Another 35% is due after the in-progress inspection passes. The last 30% is due after the final inspection passes.
What goes in the first two sections of the county's application?
Sections A and B of the Miami-Dade County Uniform Roofing Application identify the job and show the roof from above. In Section A, the county wants to know who the contractor is. It asks where the work will happen. It also asks what work is planned. Section B asks for a roof drawing with dimensions.
Roof category and roof type have their own boxes on the form. The category tells you what system is involved, like asphalt shingles or metal panels. The type tells you what work is planned, like repair or reroofing. Section A has separate spaces for the low-slope and steep-slope areas. It also asks for the total in square feet. If your main roof is pitched and there's a low-slope roof over an addition, ask your contractor to show you where each area is listed.
The county's drawing instructions call for every roof level and section to be shown. The drawing also has to show where the drains and other outlets are. It shows any parapets, which are walls that extend above the roof edge. The drawing marks the areas that get higher wind pressure and gives their dimensions. Ask your roofer to point out the roof over each part of the house that's included in your proposal, especially if a garage or addition has a different roof.
Where does the application show how my roof will be built?
The county's instructions list Sections A, B and C for a low-slope roof. If you're getting asphalt shingles or metal, the application uses Sections A, B and D. For concrete or clay tile, it uses Sections A, B, D and E. Section E is where the proposed tile attachment gets checked.
Section C starts at the deck, which is the surface the roof system sits on, and asks how the low-slope roof will be built from there. The form asks for the manufacturer and product approval number. It also asks what type of deck you have and how thick it is. Then it asks how layers like insulation and roofing sheets will be attached and how far apart the fasteners will be in different parts of the roof. The form asks for the design wind pressures for your job and the maximum design pressure listed for that specific approved system.
Section D asks what roof covering you're getting and what type of underlayment will go beneath it. Underlayment is the layer under the finished covering. The form also asks for the roof's shape and pitch, meaning how steep it is. It asks whether there's ventilation at the ridge. It also asks what kind of drip edge is planned. Drip edge is the trim that helps direct water off the roof edge. If your estimate only says the roof will meet code, ask for the exact underlayment product name so you can compare the estimate with what's proposed for your roof.
Section E checks how much resistance each area of a tile roof needs against what the product approval shows for the way the tiles will be attached. Miami-Dade's form gives a separate method for each of the two kinds of attachment calculations it describes. It says the simplified method applies only in Broward. You can ask your contractor to point out where the proposed tile attachment is listed and show you how it was checked for your roof.
What paperwork goes with the uniform roofing application?
Start with Miami-Dade County's instruction table. It lists 7 attachment categories and shows which ones go with each roof system. The list includes a fire directory listing page and pages from the product approval. It also includes the municipal permit application. For reroofing only, it lists the Owner's Notification for Roofing Considerations.
For the product approval, the instructions call for the front page and the description of the specific system, including its limitations. They also call for the general limitations and the drawings that apply. Ask your roofer to point to the specific system description and detail drawings for your installation. If another component of the roof has its own approval, the instructions list an attachment category for that too.
The instruction table calls for a design calculation attachment for low-slope, tile and metal applications. It also has a category for any required roof testing or calculation documents. Ask your contractor, "Which attachments go with this roof, and which approval pages describe the installation you priced?" Then you'll have something specific to compare with the proposal.
What are you confirming with the first 4 initials on the owner's notice?
The first 4 items cover how the roof looks and whether the wood deck needs to be nailed down again. They also cover roofs shared by neighbors and ceilings where you can see the underside of the deck. Miami-Dade County's notice says the roofing contractor is responsible for providing the required roofing permit and explaining the form. Your initials beside each item show that it was explained to you.
1. Appearance and workmanship. The notice says the roofing workmanship provisions in Chapter 15 for the High Velocity Hurricane Zone address wind resistance and keeping water out. For appearance choices outside zoning requirements, the notice directs you and your contractor to address them in your agreement. If a particular color or architectural look matters to you, ask to have it written into the agreement before you sign.
2. Renailing the wood deck. The notice says the existing wood may have to be fastened again under Chapter 16 when the roof is replaced. The old roofing usually hides the deck until it comes off. Ask how the crew will explain what it finds once it can see the wood. Fastening sound wood again and replacing damaged wood are different jobs. Ask how your proposal describes each one.
3. Common roofs. The notice calls it a common roof when there's no visible dividing line between neighboring units. It says the roofing contractor, the owner or both should tell the people next door about the work. If that sounds like your townhouse or condo, agree on who will let the neighbors know.
4. Exposed ceilings. If you have an open beam ceiling, you may see the underside of the roof deck from inside the room. The notice says nail tips that come through the wood may change how it looks. If you want to keep that look, show your contractor the room and ask how they'll address it before they price the work.
What should you talk through before giving the last 4 initials?
Items 5 through 8 cover standing water and where water can leave the roof if it overflows. They also cover ventilation and any solar panels already on the roof. The county's notice explains why each can matter when you replace the roof. Before you initial each line, ask your contractor how it applies to your house, especially if the roof has a low area or already has solar panels.
5. Ponding water. Ponding is when water collects in a low spot. The notice says it can be a sign of a structural problem that may need a structural engineer to look at it. It also says ponding can shorten the life of your new roof. You may only see it once the old roofing comes off, according to the notice. The notice says ponding should be corrected. Ask how your contractor will explain what they found and put any proposed correction in writing.
6. Overflow scuppers. A scupper is an outlet through a wall at the roof edge. The notice explains that raised walls or other roof extensions can get in the way of runoff and let water build up if there are no overflow scuppers (wall outlets). It says overflow outlets may be needed under Chapters 15 and 16 and the Florida Building Code's plumbing provisions. If your roof has raised edges, ask your contractor to show you on the permit drawing where overflow water would go.
7. Ventilation. The notice says you must not reduce the attic ventilation you already have. If your proposal changes a ridge vent or another opening that lets air move through the attic, ask how the new layout will keep at least that amount of ventilation.
8. Existing solar systems. The notice says you need a separate permit to put an existing rooftop photovoltaic system back on. That's the kind of solar panel system that generates electricity. The notice says that permit must be obtained before the roofing permit can be finalized. The uniform roofing application also asks whether the existing solar will go back on. If yours will, ask who's getting the solar permit and where that's written.
Where can I see what I owe Apex as the permit moves forward?
At Apex Roofing Solutions Corp., we list the permit fees in your residential roof replacement contract before work starts. We put the price and payment terms in that same contract. We handle the roofing permit and both inspections. You pay a $500 deposit at signing. Of the remaining balance, 35% is due when the permit is approved. The next 35% is due after the in-progress inspection passes. The last 30% is due after the final inspection passes.
If you're worried the bill will go up once the old roof comes off, look at the wood rates in your contract. We write down the rates for rotten decking, fascia and soffit per sheet or per foot, as applicable. Fascia is the board along the roof edge. Soffit is the underside of the overhang. We charge you only for what we actually replace. If you want to finance the roof, we show the monthly payment on the quote.
We're based in Miami Lakes and are licensed and insured under Florida roofing contractor license CCC1336242. When you book a free roof inspection, we'll get on the roof and show you photos from your house. We'll explain what needs fixing and what is cosmetic. If you're looking at permit forms or a proposal, you can bring those questions to the visit. Call 305-290-2482 to book an inspection.
Questions homeowners ask
Does Miami-Dade ask for the owner's notification on a repair?
The county's uniform application instructions list attachment 6, the Owner's Notification for Roofing Considerations, for reroofing only. Section A has one box for repair and another for reroofing. If you're unsure what work is being filed, ask your contractor which box describes it.
What if I can't explain an item back to my roofer?
Ask your roofer to go over it again before you initial that line. If you have an open beam ceiling, for example, ask where you might see nail tips from inside and how the proposal deals with the finish you want.
Do I still need the municipal permit application if I have the county's uniform form?
The county's instructions list the municipal permit application as attachment 5 alongside the sections of the uniform roofing form. Ask your roofer which building department is handling your job and which forms they'll file together.
What do I owe Apex when the permit is approved?
For an Apex home roof replacement, you pay 35% of the remaining balance when the permit is approved. The deposit is $500 at signing. The next 35% is due after the in-progress inspection passes. The last 30% is due after the final inspection passes. You can see the permit fees in your written contract.