Florida's Roofing Technical Advisory Committee recommended six corrections to the 9th Edition, including a tile table that should show feet and a roof insulation provision that should say panels can go directly over lightweight concrete unless the product approval prohibits it. The Florida Building Commission has a December 8 meeting scheduled, and the recommendations published as of November 21 show no final Commission action yet; the 9th Edition takes effect December 31. For your address, confirm which edition applies with the building department reviewing your permit. Apex Roofing Solutions Corp. offers a free roof inspection and puts every fee in writing, with residential replacement payments tied to permit approval and city inspections after the $500 deposit.
Key takeaways
- The roofing committee's tracking chart lists 6 corrections for the 9th Edition. The detailed comments record a 9-0 committee recommendation for each.
- The Florida Building Commission lists a December 8 meeting. The roofing comments reviewed on November 21 show blank Commission Action fields.
- Section 1525's tile table would show roof heights in feet. RAS 117-20 would allow rigid insulation directly over lightweight concrete unless the product approval prohibits it.
- Miami-Dade Product Control lists December 31, 2026, as the effective date for the 9th Edition. Confirm which edition applies to your permit with the building department reviewing it.
Has the Commission approved the six roofing corrections?
As of November 21, the Florida Building Commission's roofing comments show a 9-0 advisory committee recommendation for each of the six items and a blank Commission Action field for each. The Commission calendar lists December 8 for the full Commission meeting. Check the Commission's code development page for the posted action before relying on a correction.
Errata are corrections to published or drafted text. The Commission's August 19 roofing agenda says the committee reviews proposed corrections for demonstrated errors or conflicts in the 9th Edition under Section 553.73(8), Florida Statutes. Some of these recommendations would bring the wording into line with changes the Commission previously approved. The roofing comments identify those earlier changes by number.
Which code references and wording would be corrected?
Four items address a leftover reference, a term used in the hurricane zone rules, duplicate numbering and a typo in the year of a referenced standard. If a contractor cites one of those items for an added charge, ask them to show you the applicable section and explain what work that section calls for on your roof.
The first correction would remove the leftover ASTM D2823 reference from Chapter 46 of the Residential Code. The roofing comments say an earlier change called for removing both ASTM D2822 and ASTM D2823. The second would change the first sentence of Building Code Section 1519.7 from “roofing assembly” to “roof assembly,” the term used for the parts that make up the roof in the High Velocity Hurricane Zone provisions.
The fifth correction addresses two subsections numbered 1.1 in the scope of TAS 114, a testing protocol. The sixth addresses a year typo in the ASTM D2116 reference in Section 18 of RAS 110, a roofing application standard. The roofing comments describe these as corrections to the text.
What would change in the tile table and the roof insulation wording?
The tile correction would make clear that the numbers at the top of the table are heights in feet. The insulation correction would say rigid roof insulation panels can go directly over lightweight concrete decks unless the product approval prohibits it. These are items three and four in the Roofing Technical Advisory Committee's comments.
The simplified tile calculation table in Section 1525, Section E, shows a cents symbol after the numbers 15, 20, 25, 30 and 40. Those column headings refer to mean roof height, which is the average roof height used by the table. The table uses that height and the roof slope to show how much the tile attachment must resist. If your roofer uses that table, ask which height and slope they used for your home.
In Section 6.2 of RAS 117-20, the recommended edit strikes the word “not.” A deck is the surface that supports the layers of the roof. If your roof has a lightweight concrete deck and the proposal calls for rigid insulation panels directly over it, ask to see the approval document for the proposed product and the language covering that installation.
What should you verify for a roof job planned before December 31?
Ask the building department reviewing your address to confirm which code edition applies to your permit. Miami-Dade Product Control lists December 31, 2026, as the 9th Edition's effective date. The six items in the roofing comments are recommendations for that edition, with the Commission's action still blank in the November 21 record.
Miami-Dade Product Control separately flags 9th Edition changes that affect some Notices of Acceptance for underlayments, the layer beneath the roof covering. A Notice of Acceptance, or NOA, is a Miami-Dade product approval document. The county also flags changes to testing and attachment requirements for shingles used at roof peaks and along sloping outside corners. Once the building department confirms the edition, ask your roofer to identify the proposed products and show how their approvals fit your job.
If you are planning a roof job around the December 31 date, call 305-290-2482 and ask for a free inspection so you know what your roof needs before you sign anything.
How can you check what Apex included in the price?
Apex Roofing Solutions Corp. names the roof system and underlayment in your written residential replacement proposal and lists every fee and payment term before work starts. If you're worried an unexplained code charge could raise your bill, ask us to point to the work it covers and show you where it appears in the price.
The contract lists deck wood by the sheet and fascia or soffit, the trim and underside at the roof edge, by the foot. We charge those rates only for what actually needs replacement. If you want financing, the quote shows the monthly payment so you can see it alongside the price.
You pay $500 at signing. Of the remaining balance, 35% is due when the city approves the permit, 35% after the in-progress inspection passes and 30% after the final inspection passes. If you're weighing a repair against replacement, call 305-290-2482 to book a free roof inspection. We'll get on the roof, show you photos of what we found and explain what needs fixing and what's cosmetic.
Questions homeowners ask
Does the December 8 meeting start the 9th Edition?
The Florida Building Commission lists December 8 as its meeting date. Miami-Dade Product Control lists December 31, 2026, as the date the 9th Edition takes effect.
Do the six corrections cover all the roofing changes in the 9th Edition?
The six items are the corrections in the Roofing Technical Advisory Committee's tracking chart. Miami-Dade Product Control separately lists 9th Edition changes affecting some underlayment approvals and the testing and attachment requirements for hip and ridge shingles.
What if my proposal calls for rigid insulation over lightweight concrete?
Ask the roofer to show you the exact product approval and where it addresses direct application over lightweight concrete. The recommended RAS 117-20 wording would allow direct application unless the product approval prohibits it. Ask the building department which wording applies to your permit.
How much does Apex charge to look at my roof, and when do I pay for a replacement?
The inspection is free. We price replacement after inspecting your roof. For a residential replacement, the deposit is $500 at signing. You then pay 35% of the remaining balance at permit approval, 35% after the in-progress inspection passes and 30% after the final inspection passes.
Sources
- Florida Building Commission roofing committee recommendations and correction details
- Florida Building Commission tracking chart for the six roofing corrections
- Florida Building Commission 2026 code development and correction records
- Florida Building Commission December 2026 meeting calendar
- August 19 roofing committee agenda and statutory basis for corrections
- Miami-Dade Product Control notices for the 9th Edition effective date and roofing updates
