South Florida Roofing News

What does the Florida 9th Edition hip and ridge underlayment rule change?

Updated November 22, 2026 Reviewed by Brandon Vega, owner, Apex Roofing Solutions Corp. (license CCC1336242)
New asphalt shingle roof showing the ridge and hip lines
Photo: Apex Roofing Solutions

The Florida Building Commission’s 9th Edition analysis says underlayment, the layer beneath the finished roof covering, must extend at least 6 inches over hips and ridges except where ventilation openings are provided. For a reroof in Miami-Dade or Broward under the 9th Edition, ask your roofer which HVHZ section applies to your roof covering and how the proposal handles those roof lines. The edition takes effect December 31, 2026, so confirm which edition applies to your permit application. Apex Roofing Solutions Corp. offers a free inspection, a written price with every fee, and a payment schedule tied to permit approval and city inspections.

Key takeaways

  • Building Section 1518.2 is the HVHZ entry in the Florida Building Commission’s analysis that describes a 6-inch minimum overlap at hips and ridges except where ventilation openings are provided.
  • The analysis of Building Section 1515.2.5 says the ridge vent reference for wind-driven rain resistance changes from TAS 110 to TAS 100(A).
  • The 9th Edition takes effect December 31, 2026. Miami-Dade’s permitting notice also puts county online applications submitted after 4 PM on December 30, 2026 under the new edition.
  • Apex names the underlayment in the proposal and writes out the $500 deposit and the 35%, 35% and 30% payments on the remaining balance.

Where does the 6-inch underlayment overlap go?

The Florida Building Commission’s comparison of the 8th and 9th editions says Building Section 1518.2 now calls for underlayment to overlap a hip or ridge by at least 6 inches, except where ventilation openings are provided. A ridge is the top line where two sloping sides meet. A hip is the outside corner where two sloping sides meet along a line that runs downhill.

The Florida Building Commission identifies Miami-Dade and Broward as the High Velocity Hurricane Zone, or HVHZ. Building Section 1518.2 is the entry to look for in the Commission’s analysis of the HVHZ roofing changes. The commission’s Residential analysis describes the same 6-inch minimum and ventilation opening exception in Section R905.1.1.

The Analysis of Changes compares editions. For your address, ask your roofer to show you the applicable code section and point out the hips and ridges on your roof drawing or inspection photos. It is easier to read the overlap requirement when you can see the roof line the roofer is talking about.

How does a ridge vent affect the overlap?

A ridge vent provides an opening near the top of the roof for air to leave. Under the change described in Building Section 1518.2, the 6-inch lap has an exception where ventilation openings are provided. If a vent runs along part of your ridge, ask your roofer to show the opening and explain how the underlayment will cross the ridge beyond it.

The Building analysis also describes a change in Section 1515.2.5, the HVHZ ridge vent section. The reference for wind-driven rain resistance changes from TAS 110 to TAS 100(A). That reference concerns the ridge vent’s resistance to wind-driven rain. The overlap and its opening exception are addressed in Section 1518.2.

The same analysis says Building Section 1503.5 clarifies that ventilation for attics and enclosed spaces between rafters requires both intake and exhaust, meaning air needs a way in and a way out. It points to Section 1203.3 for unvented assemblies. When your proposal shows a ridge vent, ask where air enters and which opening at the ridge lets it out.

Which edition should the roofer use for my application?

The 9th Edition takes effect December 31, 2026, according to Miami-Dade Product Control. Miami-Dade’s Permitting and Inspection Center says applications and plans submitted on or after that date must comply with the new edition. Applications submitted through the county’s online portal after 4 PM on December 30, 2026 also follow the new edition.

If you are getting quotes in December, ask which building department will receive your permit application, when the roofer expects to submit it and which edition the proposal uses. For a Broward address, confirm the submission timing with the building department handling your application. The 4 PM cutoff comes from Miami-Dade’s notice about its online portal.

Once you have the edition, ask one more question before you sign. How will the underlayment cross each hip and ridge on my roof, and where does a ventilation opening affect the overlap? Keep that answer with your roof proposal so you can refer to it when the work is underway. If you’re planning a reroof, book a free inspection with Apex to go over those details.

Where will I see the underlayment and wood charges in my Apex proposal?

Apex Roofing Solutions Corp. names the underlayment product and roof system in the written replacement proposal. We propose a roof system approved under a Notice of Acceptance, or NOA. When two bids name the same finished covering, check what each names underneath it and ask each roofer to explain the hip and ridge work included in the price.

If you are worried the bill will grow after the old roof comes off, look for the wood prices in the contract. We price rotten roof decking per sheet and list fascia and soffit prices per foot. We charge for the material actually replaced. We put every price, fee and term in writing before work starts, including the permit fees.

For a home replacement, the deposit is $500 at signing. Of the remaining balance, 35% is due at city permit approval, 35% after the in-progress inspection passes and 30% after the final inspection passes. Financing is available, with the monthly payment shown on the quote. Apex handles the permit and both city inspections.

Book a free inspection or call 305-290-2482. We’ll get on the roof, take photos and show you what needs fixing and what is cosmetic. If replacement makes sense, ask us to point out the hips and ridges on your roof and show how we would write the underlayment work into your proposal.

Questions homeowners ask

What does a 6-inch lap mean on my roof?

A lap is an overlap. The Florida Building Commission’s analysis of Building Section 1518.2 describes underlayment extending at least 6 inches over the line where the roof surfaces meet at a hip or ridge, except where ventilation openings are provided.

What if my ridge has a vent along only part of it?

The analysis of Building Section 1518.2 describes the exception as applying where ventilation openings are provided. Ask your roofer to point out where the opening begins and ends and explain how the underlayment will cross the rest of the ridge.

What if the contract is signed in December and the application is filed later?

Miami-Dade’s permitting notice uses the application submission date. It says applications and plans submitted on or after December 31, 2026 must comply with the 9th Edition. It also says applications submitted through the county’s online portal after 4 PM on December 30, 2026 must follow the new edition. Ask which building department will receive your application and which edition it will use.

How is Apex paid for a residential roof replacement?

You pay $500 at signing. Of the remaining balance, 35% is due when the city approves the permit, 35% after the in-progress inspection passes and 30% after the final inspection passes. We list the permit fees and any unit prices for wood replacement in the contract. If you use financing, we show the monthly payment on the quote.

Sources

Free Estimate

Tell Us About Your Roof

Share a few details and our team will follow up with the next step.

  • Roof repairs, replacements, and inspections
  • Tile, shingle, metal, and commercial roofing
  • Serving Miami-Dade, Broward, Palm Beach and Monroe counties

Prefer to talk to a person?

Call now if you need help today.

305-290-2482