Here in Miami-Dade and Broward, our going rates at Apex Roofing Solutions Corp. as of November 11, 2026, start with architectural shingles at $6 to $7.50 per square foot installed. Concrete tile runs $9.75 to $11 per square foot installed. For 24 gauge standing seam metal, it’s $11 to $13 per square foot installed. Use those ranges to plan. Your existing roof, the system you choose, the underlayment and the complexity of the roof all affect your price. We offer a free inspection and put the price and every fee in writing. After the $500 signing deposit, payments are tied to permit approval and two city inspections.
Key takeaways
- A roofing square is 100 square feet of roof surface. Ask the roofer how many squares they measured before you do the math.
- At Apex’s November 11, 2026, rates, architectural shingles for a 25-square roof work out to $15,000 to $18,750. Where your written price lands depends on what’s on your roof now, the system and underlayment you choose, and how complicated the roof is to work on.
- Miami-Dade County publishes its building permit fee schedules. At Apex, we put the permit fees for your job in the contract.
- At Apex, you pay $500 when you sign. You pay 35% of the balance when the city approves the permit. The next 35% is due after the in-progress inspection passes. The final 30% is due after the final inspection passes.
What would you pay for a 25-square roof in each material?
Let’s say you have a 25-square roof. At the November 11, 2026, rates, architectural shingles would work out to $15,000 to $18,750. Concrete tile would run $24,375 to $27,500. For 24 gauge standing seam metal, it would be $27,500 to $32,500. Use those figures to plan. Your written price depends on what’s on the roof now, the new system and its underlayment, and how complicated the roof is to work on.
One roofing square is 100 square feet of roof surface. So in this example, 25 squares x 100 square feet per square = 2,500 square feet of roof. Ask the roofer to measure the roof and give you the area in squares before you apply the rates. The square footage on your home listing measures the house, so it starts you off with a different number.
For architectural shingles, the math is 25 x 100 x $6 = $15,000 at the low end and 25 x 100 x $7.50 = $18,750 at the high end. For concrete tile, it’s 25 x 100 x $9.75 = $24,375 at the low end and 25 x 100 x $11 = $27,500 at the high end. For 24 gauge standing seam metal, it’s 25 x 100 x $11 = $27,500 at the low end and 25 x 100 x $13 = $32,500 at the high end.
In this example, the top of the tile range and the bottom of the metal range both come to $27,500. If both systems suit your home and you’re considering them, it’s worth asking for both prices in writing. Once we’ve inspected your roof, we can show you up to three replacement options side by side. We start with the lowest priced option.
What can move the price of the same roof up or down within the range?
Start with what the crew has to take off. Then look at what you want to put back and how much work the shape of your roof adds. The underlayment matters, too. That’s the layer that goes under the shingles, tile or metal. Ask the roofer to name the product and explain how it fits the system they’re proposing.
When you walk through the job with your contractor, have them show you what’s on the roof now and what the crew will remove. Ask whether any section takes more work to strip or rebuild. If the roofer says the roof’s complexity moved the price, have them point out the section they mean and explain what work they priced there.
For the new roof, read the full system description in the proposal. Our metal range is for 24 gauge standing seam, so use that description when you ask for a price on the same system. For each option we quote, we name the underlayment. We also specify a system with a Notice of Acceptance, or NOA, which is the document that identifies the approval for that system.
The Florida Building Commission identifies Miami-Dade and Broward as the High Velocity Hurricane Zone, the area covered by South Florida’s hurricane provisions. Ask the roofer to show you the NOA for the system on your proposal. You can check it alongside the product name and the price. [Florida Building Commission's Florida Building Code overview](https://www.floridabuilding.org/fbc/publications/fbc.pdf)
What can change on the bill after the old roof comes off?
The bill can change after tear-off depending on how much rotten wood we need to replace. We put the price per sheet or per foot in the contract before you sign. You pay for the amount we actually replace. So before you sign, check the rate for each kind of wood work.
On a full replacement, we take the old roofing off down to the wood deck. That’s the surface beneath the underlayment and roof covering. Once we’ve exposed the wood, we can see what needs replacing. The contract also gives you prices for any rotten fascia or soffit that needs replacing. Fascia is the board along the roof edge. Soffit is the underside of the overhang.
Check the wood rates as carefully as you check the total. Look for the price per sheet of decking and the applicable rates for fascia or soffit. If the crew needs to replace wood once the roof is open, ask how many sheets or feet they replaced. Multiply that amount by the rate in your signed contract to check the charge.
If you’re comparing prices before you sign, use the same wood quantities for both quotes. You can ask each contractor what the same number of sheets would add at the rate they put in writing. That shows you how the terms compare. The actual quantity depends on what the crew finds once the old roof comes off.
What should I know about the permit before I budget for the job?
Your proposal should tell you who pulls the permit. It should also tell you which fees are listed and who handles the inspections. On an Apex replacement, we pull the permit. We list the permit fees in the contract. We also handle both city inspections. Ask which building department will review the permit and where you can check its progress.
Miami-Dade County publishes the schedules it uses to set county building permit fees. If the county will issue your permit, ask your roofer to show you where the fee appears in the written price. If another building department will issue it, ask which office sets the fee for your address. [Miami-Dade County building fee schedules](https://www.miamidade.gov/global/economy/building/building-permit-fees.page)
If you’re getting a price late in 2026, ask when the roofer expects to file the application. Miami-Dade County says the ninth edition of the Florida Building Code takes effect December 31, 2026. The county says applications submitted through its portal after 4 PM on December 30, 2026, are subject to that edition. Ask your roofer to confirm the filing date and which edition they used to put together the scope of work. [Miami-Dade County Building & Environmental Permits](https://www.miamidade.gov/global/economy/building/home.page)
If you’re pricing concrete tile around that change, ask the roofer to put the exact underlayment in writing. Miami-Dade County Product Control says the new code requires product approval for underlayment beneath tile in the High Velocity Hurricane Zone. The county’s memo also says the new code removes the previous prescriptive allowance for yellow stripe underlayment. For applications submitted on or after January 1, 2027, the same memo says the installation must follow the approved uses and applicable wind uplift resistance in the current product approval or NOA. Ask whether the product in your written price fits the planned application and installation. [Miami-Dade County Product Control underlayment memo](https://www.miamidade.gov/resources/economy/board-and-code/documents/9th-edition-fbc-roofing-underlayment.pdf)
What’s in the written price when I’m deciding?
After we inspect the roof, we put the proposed work in writing. You’ll see the price and the fees there, too. On a full replacement, the work starts with taking the old roof off down to the wood deck. The scope also covers installing the new system and handling both city inspections. We name the underlayment in the proposal and put the wood replacement rates in the contract.
If you’re wondering whether you need a new roof at all, start with the photos. We go up on the roof and show you what needs fixing and what’s cosmetic. If a repair will solve the problem and makes sense for the life the roof has left, we quote the repair. If replacement makes sense, we give you written prices for the systems we can offer on your home.
If you’re comparing two residential replacement prices, first check whether both include taking the old roof off all the way down to the deck. Then check which underlayment each roofer names and look for the system approval. Find the permit fee and the unit prices for any wood the crew has to replace. Ask the roofer to show you where each item is written so you can see what each total covers.
While you have the scope in front of you, check the warranties. We give you a 10-year workmanship warranty in writing. We also provide a manufacturer warranty where the system has one. That warranty depends on installation to the manufacturer’s specifications, so match the warranty paperwork to the system in your proposal. Apex Roofing Solutions Corp. is based in Miami Lakes. We’re licensed and insured, and our Florida license is CCC1336242.
If you want a written price for your home, you can book a free roof inspection. We’ll show you the photos and go through what each option covers so you can decide.
How should I budget for payments from signing to final approval?
Set aside $500 for signing. We split the rest into three payments. When the city approves the permit, you pay 35% of the balance. Another 35% is due after the in-progress inspection passes. The last 30% is due after the final inspection passes.
To see what each payment comes to for your roof, start with the price on your written quote. Subtract the $500 deposit. Multiply the balance by 0.35 for the permit approval payment. Use 0.35 again on that same balance for the in-progress payment. Then multiply that balance by 0.30 for the final payment. Keep the contract’s rates handy for any additional wood replacement so you can account for the work the crew actually does.
If you’re paying from savings, write down the three amounts next to the events that make them due. If you want to finance the replacement, we show you the monthly financing amount alongside the quoted price so you can compare options. Your quote holds for 30 days. Keep that window in mind if you’re getting more than one proposal or deciding between systems.
When it’s time for the permit, ask for the permit number so you can look up the approval. Ask to see the result after each inspection. Miami-Dade County has online tools to check permit application status and track inspections on county permits. Keep the final inspection result with your signed contract and written warranties so you have them when you need them. [Miami-Dade County Building & Environmental Permits](https://www.miamidade.gov/global/economy/building/home.page)
If you’d like to see what your roof would cost, call 305-290-2482 to book a free inspection and get the price and payment terms in writing.
Questions homeowners ask
Can I use the square footage from my home listing to price a new roof?
Start with the measured area of the roof itself. One roofing square is 100 square feet of roof surface. Ask the contractor to put the number of squares on your proposal so you can see what area they priced.
How long is my Apex roof replacement quote good for?
Your written Apex quote holds for 30 days. Look in the contract for the permit fees. You’ll also see what we charge per sheet or per foot for any rotten wood that has to be replaced.
What warranty do I get with an Apex roof replacement?
We give you a 10-year workmanship warranty in writing. Where the system has a manufacturer warranty, that warranty also applies and depends on installation to the manufacturer’s specifications.
How much do I pay Apex before work starts on my roof?
For a residential replacement, you pay $500 when you sign. When the city approves the permit, you pay 35% of the balance. The next 35% is due after the in-progress inspection passes. The final 30% is due after the final inspection passes.