Start with the Town of Cutler Bay’s Re-Roof Permit Checklist. It calls for a permit application and two copies of the contractor’s roofing package. You also need two copies of the Notice of Acceptance, which documents the approved roofing product and its limits. The Town requires a $130 upfront review fee. If you apply as an owner-builder, the Town also requires an affidavit and limits that route to shingle roofs and peel-and-stick. The $130 gets your application reviewed. Ask the Town’s Building Division what else applies to your address and what the full permit will cost. At Apex Roofing Solutions Corp., we offer a free roof inspection and put every fee in your written contract. On residential replacements, we handle the permit and two Town inspections. After the $500 signing deposit, payments are due when the permit is approved and as each inspection passes.
Key takeaways
- Cutler Bay’s Re-Roof Permit Checklist has 5 items. The owner-builder affidavit is one of them when it applies to you.
- Cutler Bay wants 2 copies of the contractor’s roofing package and 2 copies of the Notice of Acceptance.
- The Town requires a $130 upfront fee to review your application. Ask the Building Division what the full permit will cost.
- Cutler Bay limits owner-builder roof permits to shingle roofs and peel-and-stick. If you sign as the owner-builder, the Town’s disclosure says you’re responsible for directly supervising the work on site.
- For tile, the Miami-Dade Uniform Roofing Application in the Town packet adds Section E to calculate how the tile needs to be attached.
What are the 5 items on Cutler Bay’s re-roof checklist?
The Town of Cutler Bay’s Re-Roof Permit Checklist has five items. Four are the permit application, the contractor’s roofing package, the Notice of Acceptance, and the upfront fee. The fifth is the owner-builder affidavit. That applies if you take responsibility for the work as your own contractor.
1. Start with the permit application. You’ll find a fillable version on the Town’s Building Forms page. Check that the property address matches the one on your roofing proposal. If the quote shows a different address or leaves out a part of the roof you discussed, go over it with the roofer before the application goes in.
2. Read the owner-builder affidavit if it applies to you. The Town includes an Owner-Builder Disclosure Statement with the checklist. If a roofer asks you to pull the permit in your own name as the owner-builder, read the disclosure before deciding who should take responsibility for the permit.
3. The Town asks for two copies of the contractor’s roofing package. Have your roofer show you where the package names the proposed covering and where it shows which parts of the house it covers. If you have shingles over the main rooms and a low-slope roof over an addition, look at the sketch together.
4. The Town asks for two copies of the Notice of Acceptance. A Notice of Acceptance, or NOA, is the document that tells you which roofing product or assembly is approved and under what conditions it can be used. Ask your roofer to point to the specific system on the approval so you can match it to what you’re buying.
5. The upfront review fee is $130. The Town requires the $130 for review. If you’re comparing bids, look for the permit fee in writing on each one. Ask who will pay the Town when the application is filed.
Who’s responsible when you sign as an owner-builder in Cutler Bay?
You’re responsible for the permit and for directly supervising the work on site. That’s what the Town’s Owner-Builder Disclosure Statement says. The Town’s roofing checklist limits this route to shingle roofs and peel-and-stick. Peel-and-stick is material with an adhesive backing that bonds to the surface underneath.
The Town asks you to prove ownership before it issues an owner-builder permit. The disclosure lists a recorded deed showing you own the property, a copy of a mortgage or warranty deed, or a Miami-Dade County tax receipt statement with the legal description and the property in your name. Make sure the name and legal description on your proof match the application. The disclosure also asks for the folio number, which identifies the parcel. If the property has no address, the disclosure says it needs one assigned before permitting.
Fill out and sign the disclosure, then return it to the permitting agency before the permit is issued. The Town’s form lists a copy of the owner’s driver license, a notarized owner signature, or another form of verification the agency accepts. Read the disclosure before signing so you know what you’re taking on.
The Town’s disclosure says you may not hire an unlicensed person to act as the contractor or supervise the work. If you directly supervise unlicensed workers as your employees, the disclosure describes your obligations as an employer, including withholding and workers’ compensation. If you hire a licensed contractor under an owner-builder permit, the form says you’re responsible for checking the license and workers’ compensation coverage. If you want the roofer to take responsibility, ask whose name will be on the permit before you sign the proposal.
Which parts of the roofing application does your roof covering need?
Look at the Miami-Dade High Velocity Hurricane Zone Uniform Roofing Application in the Town’s packet to see which sections apply to your roof. Asphalt shingles and metal both use A, B and D. Concrete and clay tile use A, B, D and E. Low-slope roofing uses A, B and C. The Town’s packet labels this as the Florida Building Code 8th Edition (2023) version.
Section A shows who the contractor is and where the job is. The form asks whether it’s a re-roof or another type of work and has separate fields for steep and low-slope roof area. It also asks about gas vents and whether existing rooftop solar will be reinstalled. If you have solar, ask your roofer to show you the answer on the form and where the proposal says who will handle that work.
Section B is the drawing of your roof. The form asks for dimensions for all roof levels and sections and identifies features such as drains and scuppers. A scupper is an opening at the roof edge that lets water drain through a wall. If you have a low-slope addition, have your roofer point to it on the drawing and show you which system the quote covers for that part of the roof.
Section D describes a steep roof. It asks who makes the product and what its product control number is. It also asks for the roof slope, the underlayment, which is the layer beneath the finished covering, and how the roof is fastened. Section C asks what layers make up the low-slope system and how they’re fastened or bonded. Section E checks how the tile is attached against the forces each area of the roof is designed to resist. The form says you can use its simplified tile calculation method only in Broward County. Cutler Bay is in Miami-Dade.
Which pages should your roofer show you with the roof approval?
Start with the approval pages for the assembly your roofer quoted. The Uniform Roofing Application instructions in Cutler Bay’s packet call for the front page and the description of the specific system. They also call for the limits on that system and the general limits. The applicable detail drawings go with those pages. Ask your roofer to show you where the covering and the named underlayment match what they plan to file.
The same instructions list a fire directory listing page and approvals for other components. They also list the municipal permit application and the Owner’s Notification for Roofing Considerations for re-roofing. Include any roof testing or calculation documentation the instructions require. The attachment table lists item 3, design calculations, for metal, tile and low-slope applications. The asphalt shingle row leaves out item 3 and still lists item 7 for any required testing or calculation documentation.
If two proposals both say metal, ask each roofer to write down the manufacturer and the exact system they priced. Then ask for the matching approval and have them point out the underlayment. You can ask the same questions about a tile or shingle quote. If a product changes before installation, ask for the reason in writing and ask whether it changes the application or the price.
What do the Town’s two hurricane retrofit affidavits cover?
One affidavit covers how the roof deck is fastened and protected from water. The roof deck is the surface beneath the roofing layers. The other affidavit covers the connections that hold the roof structure to the walls. Both Town forms refer to Florida Statutes section 553.844 and say they apply to existing site-built single-family homes.
The Town’s decking affidavit is for the contractor’s qualifying agent to certify that the deck attachment and fasteners will be strengthened and corrected as required by the Manual of Hurricane Mitigation Retrofits for Existing Site-Built Single Family Structures that the Florida Building Commission adopted by Rule 9B-3.047, Florida Administrative Code. It also calls for the agent to certify that a secondary water barrier will be provided as required by the same manual. That’s a layer intended to help keep water out if the roof covering is damaged. Ask your roofer what work is included and where it shows up in the written price.
The Town’s roof-to-wall exemption affidavit is for the property owner. The form lists three possible bases: County records showing a valuation of less than $300,000.00, a property insured for not more than $300,000.00, or a building built to the Florida Building Code or the 1994 edition of the South Florida Building Code. Before you sign, ask the Building Division which basis applies to your home and what record supports it. Ask separately whether the decking affidavit applies to your work.
What should you check when your roof is ready for inspection in Cutler Bay?
Keep your permit number and ask your roofer to send you each inspection result. The Town’s Building Forms page lists an Inspection Request form. Ask your roofer who will request the inspections. Find out where you can see the results. Then ask when you can confirm the Town has closed the permit.
If you find an open permit from earlier work, look for the Open & Expired Permit Search Form on the Town’s Building Forms page. The Town also publishes a Roofing Inspection Report. It asks for the permit number and the original contractor. It also asks for the type of roofing and the inspection date. The inspector records whether the covering is satisfactory with no evidence of leaks or lists the deficiencies and what needs correcting. Ask the Building Division whether that report applies to your old permit and what else it needs to close the record.
When we replace a residential roof at Apex, we handle the permit and arrange the two Town inspections. A separate installment is tied to each result, one for the in-progress inspection and one for the final. Keep the results with your permit number and written warranties so you can find them later.
Where does Apex spell out your permit fees and possible wood charges?
At Apex Roofing Solutions Corp., we list the permit fees in your written contract and give you the unit prices for rotten wood before work begins. For a home roof replacement, you pay $500 at signing. You pay 35% of the balance when the Town approves the permit. The next 35% is due after the in-progress inspection passes. The last 30% is due after the final inspection passes.
The part homeowners worry about is what happens to the price when the old roof comes off. On a full replacement, we take the old roofing off down to the wood deck. The contract gives you a price per deck sheet. It also gives you prices per foot for fascia, the board along the roof edge, and soffit, the underside of the overhang. You pay for the wood we actually replace. Ask us to show you those prices in the proposal so you know how we’ll calculate any added work.
During the free inspection, we get on the roof and show you photos of what needs fixing and what’s cosmetic. If a repair makes sense for the life your roof has left, we quote the repair. If replacement makes sense, we can put up to three roof systems side by side for you. We name the underlayment in the proposal. If you’re looking at financing, we show the monthly payment on the quote. The quoted price holds for 30 days.
We’re licensed and insured under Florida roofing license CCC1336242. On residential replacements, we provide a written 10-year workmanship warranty. The manufacturer warranty applies where the system has one, subject to installation to the manufacturer’s specifications. If you’d like to go over your roof and see what we’d put in the proposal, book a free roof inspection. Or call 305-290-2482 if you’d rather talk it through first.
Questions homeowners ask
Does Cutler Bay’s $130 review fee tell me what the whole permit will cost?
The Town’s Re-Roof Permit Checklist lists $130 as the amount you pay upfront for review. Ask the Building Division for the full permit cost for your address. Then check the permit fee in your roofing contract.
Can I apply as an owner-builder in Cutler Bay for a tile or metal roof?
The Town’s Re-Roof Permit Checklist limits owner-builder roofing permits to shingle roofs and peel-and-stick. If you’re replacing your roof with tile or metal, ask your licensed roofer to show you the contractor’s permit package.
Can I use the Notice of Acceptance in place of the roofing package?
The Town lists them separately and asks for two copies of each. The Notice of Acceptance tells you which roofing product is approved and the limits on its use. The roofing package tells you what work is proposed for your home.
Where can I get Cutler Bay’s permit application and inspection form?
Go to the Town’s Building Forms page for the fillable Permit Application Form and the Inspection Request form. The Re-Roof Permit Checklist and the Roofing Inspection Report are listed there as separate documents.
How does Apex charge for a roof replacement in Cutler Bay?
We quote the job after a free roof inspection and list the permit fees in your written contract. You pay $500 when you sign. Then you pay 35% of the balance when the permit is approved. Another 35% is due after the in-progress inspection passes. The last 30% is due after the final inspection passes. Your contract shows the unit prices for any rotten wood that needs to be replaced. If the quote includes financing, it shows your monthly payment.