We can tell you how many wood sheets need replacement once the old roof comes off and we can check the deck. Roof size alone cannot give you that count. Apex Roofing Solutions Corp. writes the replacement price per sheet or per foot in your contract. We charge only for wood actually replaced, with photos showing the work. A free inspection helps us explain what we can see before signing, but it cannot establish a final count for wood still covered by roofing.
Key takeaways
- The Florida Division of Emergency Management recommends inspecting the exposed deck. Roof area alone does not establish how much wood is damaged.
- Apex Roofing Solutions Corp. refastens sound decking and replaces cracked or rotten wood.
- Apex Roofing Solutions Corp. puts wood rates per sheet or per foot in the contract and photographs every piece of carpentry.
- Apex residential payments start with $500. Then you pay 35%, 35% and 30% of the balance at permit approval and inspection milestones.
- The City of Sebastian guidance describes a structural evaluation threshold above 30% deck removal under specified conditions. That is not a standard replacement allowance.
Why can't roof size tell me how many sheets need replacing?
Roof size tells us how much area there is. It does not tell us how much of the wood underneath is damaged. We get the replacement count by inspecting that wood. At Apex Roofing Solutions Corp., we offer a free inspection in Miami-Dade and Broward. We put wood pricing in writing, and residential payments follow city permit approval and inspection results.
The roof deck is the wood surface beneath your roofing materials, also called sheathing. The Florida Division of Emergency Management's Hurricane Retrofit Guide explains that removing the old covering exposes the deck so it can be checked for damage. Until we can see that surface, a final replacement count would go beyond what we have inspected.
When you ask, "How many sheets of wood will my roof need?" the distinction matters. Counting every sheet that makes up the roof is different from counting the sheets that need replacement. You are asking about the damaged portion. The size of your house alone does not settle that question.
The concern is understandable: you want to know whether the bill can grow after the roof comes off. We address that uncertainty by putting the unit price in your contract. The quantity depends on what is actually replaced. Book a free roof inspection or call 305-290-2482 so we can explain the visible findings and the wood terms before you sign.
When does wood need replacement instead of more nails?
Adding nails does not replace damaged wood. Damaged material and loose attachment are different problems. The Florida Division of Emergency Management recommends inspecting exposed decking for rot, separated layers, warping or structural weakness. It then recommends replacing affected sections with similar material of the same thickness.
Separated layers are also called delamination, which means the layers of a panel have come apart. If a contractor uses a technical word to explain why wood needs replacement, ask them to show you that condition in your photos. Have them explain what the word means on your roof.
Apex replaces cracked or rotten wood and refastens sound decking before the new roof goes on. We call that refastening back nailing. It is essentially securing the existing sound wood back to the structure beneath it. First, we determine whether the wood can stay. Then we address how it is attached.
The Florida Home Builders Association's March 2026 roofing training identifies failure to replace damaged sheathing or structural members as a code problem. It cites Florida Building Code Residential Section R908.2, which addresses whether structural roof components can support the roof system and installation loads. The decision follows the condition of the wood, rather than its age alone.
What happens to the deck once the old roofing comes off?
At Apex, we take the old roofing off so we can check the wood deck. We back nail sound wood and replace cracked or rotten wood. Then we photograph the carpentry and show you what was done. That gives you a record behind the replacement quantity.
The Florida Division of Emergency Management describes the same basic order for an exposed shingle roof deck. Remove the covering and underlying paper, then inspect the wood. Replace damaged sections, then check the attachment to the supporting roof structure. Both checks matter because sound wood still needs to be adequately fastened.
The guide also distinguishes wood planks from panel sheathing such as plywood or oriented strand board, commonly called OSB. Its attachment discussion differs between the two. So ask what kind of deck your house has, instead of assuming every roof has the same sheets and fastening details.
You do not need to choose a nail pattern from an online article. Ask your roofer to explain your deck material and the attachment work included in the proposal. Keep that explanation with your contract. It gives you a way to distinguish planned refastening from replacement wood documented during the job.
How should my contract explain rotten wood charges?
Your contract should state the price and the unit it applies to in terms you can recognize. Apex writes rotten deck wood, fascia and soffit pricing per sheet or per foot in the contract. Then we charge only for what is actually replaced. We do not publish a wood rate here because your written contract supplies it.
Fascia is the board along the roof edge. Soffit is the material beneath the roof overhang. Keep both separate from the deck beneath the roof covering. A plywood quantity alone does not describe all the carpentry at the edge of a house.
Before signing, ask which items are measured by the sheet and which are measured by the foot. Also ask how the contractor records a partial replacement. You want to understand how the measurement on the work record connects to the unit in your contract. That way, you do not have to work it out after installation.
To review the charge, match the documented replacement quantity to your signed unit rate. If the record uses a different unit from the contract, ask for an explanation before accepting the calculation. A written rate helps only when you can also follow the quantity it was applied to.
What should I see in the photos before accepting a wood charge?
You should be able to connect the photos to your own roof and the replacement quantity being charged. Apex photographs and shows every piece of carpentry. What we do not show is not billed. That documentation gives you something concrete to check against your contract.
Ask to see the condition that led to replacement, beyond a general picture of the roof. If a contractor says the wood is rotten, the explanation should identify the affected section. If cracked material is the reason, ask them to show you that condition and explain the replacement.
Then ask how the photographs connect to the quantity on your bill. A photo of new wood shows work, but you still need a count or measurement you can understand. Keep the replacement record with the photos. Review both against the agreed price per sheet or per foot.
This is how we address the trust question. You should not have to accept an unexplained carpentry total because the deck has already been covered. At Apex, we make showing the work part of our practice. During your free inspection, ask us to explain how the wood documentation connects to the written rates.
Can extensive deck damage involve more than a sheet count?
Yes. Extensive deck removal can raise a structural review question beyond how much replacement plywood is needed. The City of Sebastian's published reroofing guidance describes a design professional evaluation when structural deck removal exceeds 30% of a building's structural diaphragm in a high wind region. It cites Florida Existing Building Code Section 707.3.2.
That guidance concerns how the roof structure and its connections resist wind loads. It does not say that 30% of every roof must be replaced. It also does not mean a contractor should stop replacing damaged wood at that percentage.
The Sebastian document comes from another Florida city. By itself, it does not establish your Miami-Dade or Broward permit requirements. If the proposed removal is extensive, ask your contractor how the applicable building department will address it. Also ask whether a design professional needs to evaluate the work.
There is more to ask than, "How many sheets did you order?" Ask whether the findings involve only damaged decking or also the supporting structure. The Florida Home Builders Association's discussion of Section R908.2 explains why that distinction matters. The roof's structural components must support the roof system and the loads encountered during installation.
How do the wood terms fit Apex's residential payment schedule?
Apex puts the wood unit rates in your contract before work starts. The final replacement quantity depends on what is exposed. For a residential replacement, you pay $500 at signing. Then you pay 35%, 35% and 30% of the remaining balance at the stated permit and inspection milestones.
The first 35% of the balance is due when the city approves the permit. The next 35% is due after the in-progress inspection passes. The final 30% is due after the final inspection passes. When you review the proposal, keep each payment amount beside its milestone.
Financing is available, and your quote shows the monthly amount. A quoted price holds for 30 days. That price hold does not establish how much covered wood needs replacement. Your contract's per-sheet or per-foot terms still explain how actual replacement wood is charged.
The most important point is that you have a written method for the uncertainty. You can review the unit price before signing. You can review the documented quantity after the work is exposed. Ask us to explain anything you cannot follow. We want you to understand the calculation before it becomes part of your bill.
What should I know before the crew removes my roof?
Before removal starts, know your written wood rate and how replacement quantities will be documented. Also know the payment milestones. Those answers will not tell you the condition of every covered sheet. They give you a way to understand and check the work once the deck is exposed.
Start with the scope and ask what happens to sound wood and what conditions call for replacement. Then review the pricing units for the deck and the roof-edge carpentry. Finally, ask how you will receive the photos and replacement record. Each answer should connect to something you can keep or review.
If you are still deciding whether the whole roof needs replacement, start with the inspection. Apex quotes a repair when it fixes the problem for less than the roof has left to give. Otherwise, we quote replacement options. A concern about the wood beneath the covering is a reason to inspect and explain the findings, rather than assume the answer.
Apex Roofing Solutions Corp. is based in Miami Lakes and serves Miami-Dade and Broward. We are licensed and insured, Florida Certified Roofing Contractor CCC1336242. Call 305-290-2482 to book a free roof inspection. We will show you your own roof photos and explain the written wood terms so you can make an informed decision.
Questions homeowners ask
Can you tell me the exact number of replacement sheets before removing my roof?
We cannot promise a final count while the wood is still covered by the old roofing. Apex inspects the roof and shows you the findings before signing. Then we check the exposed deck during replacement. Your contract states how replacement wood will be priced.
Does back nailing mean I am buying new plywood?
No. Back nailing means refastening the existing sound wood to the structure beneath it. Replacing a damaged sheet means taking that wood out and installing replacement material. Ask your contractor to explain those as separate parts of the scope.
Does a larger roof automatically need more rotten wood replaced?
A larger roof tells you there is more area. It does not tell you the condition of each section of wood. The Florida Division of Emergency Management recommends inspecting the exposed deck for rot, separated layers, warping and structural problems. Those findings determine the replacement count.
How can I check the wood quantity on my bill?
Ask for the replacement record and photos. Then compare the documented quantity with the unit and rate in your signed contract. Apex photographs and shows every piece of carpentry. What we do not show is not billed.
What does Apex charge for wood, and when do I pay?
After the inspection, Apex writes wood rates per sheet or per foot in your contract. This page does not publish a dollar rate for replacement wood. Residential replacement starts with $500 at signing. You pay 35% of the remaining balance at city permit approval. You pay 35% after the in-progress inspection passes. You pay 30% after the final inspection passes. Financing is available, with the monthly amount shown on the quote.