How long does a roof replacement take from signing to final inspection in Miami-Dade and Broward?

Updated November 18, 2026 Reviewed by Brandon Vega, owner, Apex Roofing Solutions Corp. (license CCC1336242)
Roofing crew installing underlayment after tear-off on a home
Photo: Apex Roofing Solutions

For a home roof replacement in Miami-Dade or Broward, Apex Roofing Solutions Corp. estimates about 2 to 4 weeks from signing to permit approval. Once the permit is approved, we give you a firm installation date. That estimate of 2 to 4 weeks covers the permit stage. After approval, we take off the old roof, go through the in-progress city inspection, install the new roof and go through the final city inspection. How long it takes to get from approval to final inspection depends on your roof and the inspection schedule. We offer a free roof inspection. We put your price and every fee in writing. We tie the remaining payments to permit approval and the two city inspections.

Key takeaways

  • At Apex, we estimate about 2 to 4 weeks from signing to permit approval. Once the permit is approved, we give you a firm installation date.
  • Under Florida Statutes section 553.792, permit review time is counted in business days once the local government receives a complete and sufficient application.
  • Apex handles 2 city inspections. Check the in-progress result while work is under way and the final result after installation.
  • Use your permit number in Miami-Dade County e-Permitting to check inspection history and project status.
  • After the $500 signing deposit, Apex bills 35% of the balance when the permit is approved. We bill another 35% after the in-progress inspection passes. We bill the last 30% after the final inspection passes.

What dates should I track when I sign?

Start by putting your signing date on the calendar. At Apex, we estimate about 2 to 4 weeks from that date to permit approval. Once the permit is approved, we give you a firm installation date. Keep track of the final inspection separately.

When you sign, you pay the $500 deposit and send us a photo of your ID. We handle the permit with your city. Ask who will let you know the permit is approved and when to expect your next update. If you have a deadline, tell us the date. Let us know whether you need the roof installed by then or need the final inspection to have passed.

If you're still deciding whether to replace the roof, book a free roof inspection or call 305-290-2482. We get on the roof and show you photos of your own home. We'll point out what needs fixing and what's cosmetic. If a repair makes more sense for the life your roof has left, we'll quote the repair.

When does the building department start counting review time?

Under Florida Statutes section 553.792, the local government's review period starts when it receives a complete and sufficient permit application. The statute counts business days. It calls for a decision within the period that applies unless the applicant waives it in writing. The department may approve the application. It may approve it with conditions. It may also deny it.

The statute lists 30 business days for residential units, including single-family homes, in structures under 7,500 square feet. It also lists a 5-business-day period for specified permit types when the work is valued under $15,000 and is on an existing single-family dwelling. Ask the building department which period applies to your application. The shorter period depends on the permit type as well as the value and type of home.

Section 553.792 also calls for written notice within 5 business days of receipt if the application is incomplete. If you're waiting for an update, ask whether the application is in. Ask whether the department has requested any missing information. Then ask whether it has issued a decision. That tells you where the job stands and whether your contractor needs to send anything back.

What should I confirm when I get my installation date?

Confirm when the crew will arrive and ask where the in-progress inspection falls in the schedule. We handle both city inspections at Apex. Before we start, we cover the pool. We cover the windows and garage too. We clean up every evening. When you know when the crew will be there, you can plan how to get in and out of your home.

On an Apex replacement, we take the old roof off down to the wood deck, which is the surface that supports the roofing. We install your new roof system with the underlayment named in your proposal. That's the layer beneath the outer roof covering. You may be considering architectural shingle. You may be looking at concrete tile. You may be looking at standing seam metal. Ask what the schedule looks like for the option you're considering.

If you need to get to the garage or driveway at a certain time, tell us. Ask where to park on tear-off day and whom to call if you need to get in while we're working. If you're planning to be away from home, use the installation date we give you after permit approval.

How can hidden wood damage change the schedule after tear-off?

If we take off the old roof and find rotten wood, we have to replace it before the new roof goes on. That adds work. We put the unit prices in your contract before we start. We price deck wood per sheet. We price fascia, the board along the roof edge, per foot. We also price soffit, the underside of the overhang, per foot. You pay for what we actually replace.

It's reasonable to worry about the bill going up after tear-off. Before you sign, look at the wood prices in the contract so you know how we'd calculate a charge. If we replace wood, ask us to show you where we found the damage and tell you how many sheets or feet we replaced. Use that quantity and the unit price in your contract to check the charge.

If we find more damage than expected, ask whether the extra work changes when the roof will be ready for inspection. We'll have a clearer idea of how much work is involved once the crew can see the deck. If you have a deadline, ask for an updated schedule once we know what needs replacing.

How do I check if the in-progress inspection passed?

Ask your roofer for the recorded result of the in-progress inspection. If your permit is in Miami-Dade County's e-Permitting system, you can enter your permit number under Permit Inspection History. At Apex, we handle the inspection. When it passes, the second 35% payment on the balance is due.

If you're told the inspection is pending, ask if it has been requested and if a result has been posted. Miami-Dade County's e-Permitting menu has one option for requesting an inspection and another for viewing inspection history. You can also use the permit number to check for inspection holds and outstanding requirements.

Start with the building department that issued your permit. If your city uses a different system, ask your roofer where to find that department's result. Keep your permit number handy so you can use the same record to check the final inspection later.

What should I check once the new roof is installed?

First, check if the final inspection has been requested. Then confirm that it passed. If your permit is in Miami-Dade County's e-Permitting system, you can look for the result under Permit Inspection History and check the permit record under Permit Project Status. If you need the result by a certain date, ask Apex for an update.

Let's say you have a closing on Friday and the roof covering is in place on Monday. Ask if the final inspection is scheduled and when you can check the result. If someone needs proof of completion, ask which document they need so you know what to send when it's available.

Keep your permit number and final inspection result with your signed contract. When the job is complete, Apex gives you a 10-year workmanship warranty in writing. If your roof system comes with a manufacturer warranty, keep that paperwork too. That warranty depends on whether the roof was installed to the manufacturer's specifications.

When are the payments due on my Apex roof?

For a home roof replacement, you pay $500 when you sign. We split the balance after that deposit into three payments. You pay 35% when the city approves the permit. You pay another 35% after the in-progress inspection passes. The last 30% is due after the final inspection passes.

We price your roof after the inspection. Your contract shows the price. It shows the permit fees. It also spells out the payment terms. We write in the unit price for deck wood. We list the unit price for fascia. We list the unit price for soffit too. Once the crew can check the wood, you can use those prices to see how any replacements will be charged. If you want financing, we show the monthly payment on the quote. The quoted price holds for 30 days.

When a payment request comes in, ask for the permit or inspection result that goes with it and keep it with your receipt. If your main concern is getting the roof replaced by a certain date, call Apex Roofing Solutions Corp. at 305-290-2482 to book a free roof inspection. Tell us the date you're working around so we can talk through the permit estimate and what has to happen before final inspection.

Questions homeowners ask

Can I tell from the signing date when my roof will pass final inspection?

Use the signing date to estimate how long the permit stage will take. At Apex, we estimate about 2 to 4 weeks from signing to permit approval. Once the permit is approved, we give you a firm installation date. As the job moves along, ask separately where things stand with the final inspection.

Does Florida's permit review period begin when I sign with my roofer?

Under Florida Statutes section 553.792, the review period starts when the local government receives a complete and sufficient application. Signing starts your project with Apex. Ask when the application went in and whether the building department has asked for anything else.

Can I check whether my roof passed final inspection?

If your permit is in Miami-Dade County's e-Permitting system, go to Permit Inspection History and enter your permit number. You can also check Permit Project Status. If a different building department issued your permit, ask your roofer where that department posts the result.

What do I owe Apex if the roof is installed and the final inspection is still pending?

The last 30% is due after the final inspection passes. For an Apex home roof replacement, you pay $500 at signing. After that deposit, 35% of the balance is due when the permit is approved. Another 35% of the balance is due after the in-progress inspection passes.

Sources

Free Estimate

Tell Us About Your Roof

Share a few details and our team will follow up with the next step.

  • Roof repairs, replacements, and inspections
  • Tile, shingle, metal, and commercial roofing
  • Serving Miami-Dade, Broward, Palm Beach and Monroe counties

Prefer to talk to a person?

Call now if you need help today.

305-290-2482