You can replace a roof during South Florida’s rainy season. The crew works in dry windows and opens only as much of the roof as it can protect before rain comes back. Once the old roofing comes off the work area, the crew checks the wood underneath. It puts down the protective layer when conditions allow. If a storm cuts that window short, the crew pauses. What can get done that day depends on the forecast at your house and where the crew is in the job. At Apex Roofing Solutions Corp., we offer a free roof inspection and put every price and fee in writing. After the $500 signing deposit, your payments are tied to permit approval and 2 city inspections.
Key takeaways
- The National Weather Service defines South Florida’s wet season as May 15 through October 15. Two nearby areas can get very different amounts of rain.
- Miami-Dade County’s roofing inspection checklist shows why the crew needs to leave some layers visible until the inspector can see them. Your city or county building department sets the inspection stages for your permit.
- Apex handles the permit and 2 city inspections. After the $500 deposit, the remaining balance is split into 35%, 35%, and 30% payments tied to permit and inspection approvals. Your Apex roofing contract lists the unit prices for rotten wood. You pay for the sheets or feet we actually replace.
How does the crew decide when it’s dry enough to start at my house?
The crew needs enough time to protect the area it opens before the next shower. First, the old roofing comes off the area the crew plans to work on. Then the crew checks the wood underneath and protects the area. A dry morning in the forecast can give the crew time to work. How long that dry window lasts helps determine how much roof to open.
The National Weather Service’s Miami office defines the South Florida wet season as May 15 through October 15. In its 2025 rainy season outlook, the office explains that conditions support showers and thunderstorms nearly every day and that nearby areas can get very different amounts of rain. For your roof, the forecast at your address matters more than rain showing up somewhere in Miami-Dade or Broward.
Ask your roofer how the crew will decide that morning. The first part of the day may look usable, but storms could develop earlier than expected. The crew needs to leave enough time to protect what it already has open. A shorter window can mean opening less of the roof or holding off on removing the old roofing altogether. If the start time changes, ask when you’ll hear from the roofer again so you can plan around the crew’s arrival.
How much of the old roof can come off before the crew covers it again?
How much roof can come off at once depends on how much time the crew has to check the exposed wood and protect it. At Apex, we do a full tear-off. That means we remove the old roofing down to the wood deck, the surface that supports the new roofing.
Before installation starts, we cover the pool. We also cover the windows. We cover the garage as well. As the old roofing comes off, we can see which wood is sound and where damaged wood needs to be replaced. Sound decking can be fastened again before the new roof goes on. If we find damaged wood in an open section, we need to address it before the next layer can go down. That work takes time out of the same dry window.
Let’s say the crew opens one part of your roof and finds several sheets of damaged wood. The question to ask is how long it will take to finish and protect that area before the crew starts the next one. Ask which part the crew plans to open first and what could make that area smaller once work starts. You can also ask for photos of any wood that needed replacement so you can see what the crew found.
What protects my roof from rain before the finished covering goes on?
What protects your roof depends on which layers are in place when the crew stops. Underlayment is the protective layer between the wood deck and the finished roofing. If the crew opens an area and conditions keep it from putting down the underlayment, ask how the contractor will cover that area temporarily until work can start again.
At the end of the day, ask your roofer to show you what’s protecting each part of the roof. You may still have old roofing in one area and underlayment in another. If an area has a temporary cover, ask who checks it after a storm. Ask whom to call if you see water inside. A quick rundown of what’s in place tells you more about your house that evening than hearing that the roof is covered.
We write the name of the underlayment product in the Apex proposal. Ask to see the Notice of Acceptance, or NOA, for the roof system. That’s the product approval document you can use to check what the proposal specifies. Then ask how long that underlayment can stay exposed under the manufacturer’s instructions for that product. That matters if a rain delay and an inspection leave several days between the underlayment going down and the finished covering going on.
If you already have a leak and you’re deciding whether to wait for replacement, book a free roof inspection. We get on the roof and show you photos of what needs fixing and what’s cosmetic. If a repair makes sense given the condition of the roof, we’ll quote it.
What does the crew do if the afternoon storm comes early?
An early storm can stop roof work for the day and change what the crew can finish. The crew needs to pause while there’s still time to protect the work area and get off the roof safely. If an area gets wet, the roofer should check its condition before deciding what can go over it.
The shower may be over before the roof is ready for installation. Ask how the crew checks the surface against the installation instructions for the product it’s using. If you see a new stain or drip inside, take a photo from indoors. Tell the contractor where you see it and when it first appeared. That gives the crew a place to check when it can safely get back on the roof.
At Apex, we set a firm installation date after the permit. Once the job starts, ask which part of the work the weather interrupted. Where the crew picks up depends on whether the rain came before the old roofing came off or after the underlayment went on. The answer should tell you what’s covered. It should also tell you what needs to happen next. Ask when the roofer expects to update you. We clean up each evening, so you can also ask when the crew expects to clear the driveway or garage access.
Can my roof stay between layers overnight while it waits for inspection?
Yes. The inspector needs to see some work before it’s covered, so part of your roof may have to wait for the next layer. For several types of roofs, Miami-Dade County’s roofing inspection checklist calls for an inspection during or after installation of the base sheet, anchor sheet, or underlayment. The checklist also lists later checks that depend on the roof covering. Your city or county building department sets the inspection stages for your permit. A city building department or a building department in Broward may follow a different schedule.
For example, the county checklist includes an underlayment stage for a shingle roof. Ask which stage applies to the permit for your house. At Apex, we handle the permit and both city inspections. Ask us which inspection counts as the in-progress milestone in your payment schedule and which layer will be in place while you’re waiting for it. Then ask what the crew can finish once that inspection passes.
If rain changes the schedule, ask what the crew is waiting for. It could be a surface that needs to dry. It could be the city inspection itself. It could be the inspection result the crew needs before it covers the work. What you’re waiting on tells you which date to ask about next. Keep the permit number and ask for the inspection results as the job goes along. You’ll have a record of when the work passed and when that payment came due.
Can rainy weather change what I owe Apex or when I pay?
Your Apex contract sets the roof price and explains what we can charge for hidden damage. When you pay depends on the permit and inspection milestones in your agreement. If rain pushes back an inspection, the installment tied to that inspection comes due when it passes.
For a residential replacement, you pay $500 at signing. Of the balance, 35% is due when the city approves the permit. Another 35% is due after the in-progress inspection passes. The final 30% is due after the final inspection passes. If you want financing, we show the monthly payment on the quote so you can see it alongside the project price.
When the old roof comes off, wood is the part of the bill homeowners ask about. For rotten decking, the contract gives you a price per sheet or per foot, depending on the item. It also lists the unit price for fascia, the board along the roof edge. It does the same for soffit, the underside of the roof overhang. We charge for the material we actually replace. Ask for the photos and the count. Then match the quantity to the unit price in your contract.
If you’re deciding between a repair and a full replacement before the next stretch of storms, call Apex Roofing Solutions Corp. at 305-290-2482 to book a free roof inspection. We’re based in Miami Lakes and serve Miami-Dade and Broward. Our Florida roofing contractor license is CCC1336242. Once you’ve seen the roof photos and the written price, you can decide whether the work makes sense now.
Questions homeowners ask
Do I need to wait until October 15 to replace my roof?
No. The National Weather Service defines October 15 as the end of the wet season. You can replace your roof during the season when conditions at your house give the crew enough time to do the work and protect the area it opens.
If I see underlayment, is my roof finished?
Underlayment goes underneath the finished tile, metal, or shingles. Ask what the crew still needs to install. Ask which inspections are still ahead. Then ask what’s protecting the roof while you’re waiting for those steps.
What should I tell my roofer if water comes in during the job?
Call the contractor and tell them which room you’re in. Describe where you see the water. Tell them when it started. Take photos from inside if you can do so safely. Knowing where and when it happened gives the crew a place to start once conditions allow.
When do I pay Apex if rain delays an inspection?
The $500 deposit is due at signing. The 35% payment at permit approval follows its own milestone. The next 35% of the balance is due after the in-progress inspection passes. The remaining 30% is due after the final inspection passes.